Click the title to read a copy of an email sent to Jan Carpenter and George Flint regarding Half a Million dollars that remains unaccounted for.
At the heart of this request is accountability in terms of the following:
- Minutes of the CDD board meetings that approved all actions taken by them regarding this claim.
- Copies of all Checks paid along with canceled checks received by any service provider named in the attached claim
- roofing needed to be totally replaced and various leaks needed to be fixed
- the swimming pool needed to be drained and cleaned as a result of all the debris it collected
- club house foundation - it was discovered that the clubhouse foundation had not been built up the several additional feet required and stated as per building plans, since the area has a very high water table, thus the requirement for additional elevation needed for the foundation PLUS a specially designed sump pump system that would prevent the water table of entering the building, had never been done.
- The insurance claim monies were supposed to pay for these need repairs, yet, to date, these repairs had not been done - so where did the money go?
No comments:
Post a Comment